Another overnight regression run finishes with familiar failures. Your engineers return to the logs, trace the same issues and try to work out what changed. Meanwhile, the next development milestone gets closer.
Making progress starts with understanding why those failures remain unresolved and who is responsible for the next action.
At ApisTech, we work together with your team on defined ASIC and SoC verification workstreams, including UVM testbench development, regression debugging, failure analysis and coverage closure.
A failed test is a starting point for investigation. The cause may sit in the RTL, the verification environment or an unclear requirement.
The next step could involve:
Separating these causes helps engineers direct their effort and avoid repeatedly investigating the same issue.
When several teams contribute to a design, responsibilities can become unclear at the boundaries. A verification engineer may identify a problem but depend on a design change, an updated model or a decision about expected behaviour.
A defined work package makes those dependencies explicit. Before starting, we agree with your team on:
This gives both teams a practical basis for managing the work and raising blockers early.
Resolving regression failures is one part of verification. The team also needs to understand which planned scenarios have been exercised and where gaps remain.
Coverage work can involve reviewing missing scenarios, developing targeted tests, correcting stimulus constraints or checking whether a coverage model reflects the verification plan.
Coverage percentages need context. Completion should be assessed against agreed requirements, reviewed exclusions and the evidence needed for the project’s sign-off process.
ApisTech takes ownership of agreed verification workstreams within your development flow. Depending on the project, our scope can include:
We define the work together, make dependencies visible and assess progress against agreed deliverables. Your team retains oversight of the wider design and sign-off decisions.
Which block is consuming the most debugging time, and what needs to be completed before your next milestone?
Contact ApisTech at info@apistech.nl. Let’s review the scope and determine where a defined verification work package could help your team move forward.